K42 CWR Step 5

The next step is a big one, we will install the AF active filter of the CWR
There is no test at the end of this step. After the PSoC processor is installed we can test for results.
Be sure you sort out all the special components of this step. Check them with a multi-meter if you cannot see the color-code on the very small resistors :-) like myself. Steve the are really small!

Here is an impression of the building:

Comments are closed.